Recommended Sequence For First Commissioning - Siemens SINUMERIK 840Di sl Commissioning Manual

Hide thumbs Also See for SINUMERIK 840Di sl:
Table of Contents

Advertisement

Power-On and Power-Up
5.1 Preparing for commissioning
● Function-impairing gases
● Climatic environmental conditions
● Storage/transport
● Shock stressing
● Vibratory load
● Ambient temperature
5.1.2

Recommended sequence for first commissioning

Requirements
The individual steps for first commissioning are listed below in the recommended order.
1. The whole plant is mechanically and electrically connected and tested for errors acc. to
2. The order numbers (MLFB) of the SIMODRIVE 611 universal drives and SIMATIC S7-I/O
122
the checklist (see previous section).
– SINUMERIK 840Di sl
– SINAMICS S120
References:
Guide for the SINUMERIK 840D sl machine configuring
– SIMODRIVE 611 universal-converter system
– Motors
– SIMATIC S7 I/O components
– HMI user interfaces
Note
Guidelines for machine configuration
The device manual "Guidelines for machine configuration SINUMERIK 840D sl"
currently refers only to SINUMERIK 840D sl with SINAMICS S120. The information
contained in this can, in principle, be applied to SINUMERIK 840Di sl with
SINAMICS S120. A revised edition for SINUMERIK 840Di sl is in preparation.
components should be available. When creating the SIMATIC S7 project you must check,
whether the component chosen from the hardware catalog by "HW Config" corresponds
to the component used on the plant.
Commissioning Manual, 05/2008, 6FC5397–4CP10–4BA0
Manual

Hide quick links:

Advertisement

Table of Contents
loading

This manual is also suitable for:

Sinumerik 840die sl control

Table of Contents