MOUNTING THE OPERATOR

Install the operator, by taking the following steps:
1. Assess any limitations in the surrounding area
such as curbs, walls, or bushes.
2. Before placing the operator on the pad,
measure and mark the output shaft center
on the concrete pad by selecting the X and Y
dimensions. Refer to Figure 5.
a. For short gates up to 10 feet (3m): If X
= 10.5", Set Y dimension at 14, 18, or 20".
(35.6, 45.7, or 50.8cm)
b. For medium gates up to 13 feet (3.9m):
If X = 12", Set Y dimension at 22, 24, or 28".
(55.9, 61, or 71cm)
c. For long gates up to 20 feet (6.1m): If
X = 15", Set Y dimension at 30, 35, or 40".
(76, 89, or 102cm)
3. Set the operator base on the concrete pad and
use it as a template. Position the operator base
so the center mark on the pad aligns with the
small hole in the base plate. Mark the fastener
and conduit cutouts. Remove the operator
from the concrete pad and drill the holes for
the concrete anchors.
4. Mount the operator with four ½ x 3½-inch
concrete anchors as shown in Figure 5.
28
| www.hysecurity.com
SWINGSMART DC PROGRAMMING AND OPERATIONS MANUAL
Hinge Center
Output Shaft Center
Potential entrapment area.
Minimum 16" (40.6cm) clearance
required. If less than 16", install a
photo-eye or edge sensor.
Base Plate
Figure 5. Mounting Operator
INSTALLATION
X
Y
Photo Eye
Photo Eye
Fasteners
Concrete
Anchors (x4)
Concrete Pad
MX3640-01 REV. D ©2018