Download Print this page

HySecurity HyNet SFP 4/1 Installation Manual

Attachment bracket kit
Hide thumbs Also See for HyNet SFP 4/1:

Advertisement

Quick Links

SwingSmart DC 20 and SwingSmart DCS 20
SlideSmart DC 15 and SlideSmart DCS 15
SlideSmart DC 10F and SlideSmart DCS 10F
for HyNet Attachment Bracket Kit: MX3866
This document is a supplemental document that provides specific information regarding
configuration of the HySecurity gate operator with installation and wiring of the HyNet Gateway.
For safety considerations and information specific to your gate operator, refer to the HySecurity
gate operator product manuals.
www.SecureOpeners.com | (800) 878-7829 | Sales@SecureOpeners.com
Installation Manual

Advertisement

loading

Summary of Contents for HySecurity HyNet SFP 4/1

  • Page 1 HyNet Attachment Bracket Kit: MX3866 This document is a supplemental document that provides specific information regarding configuration of the HySecurity gate operator with installation and wiring of the HyNet Gateway. For safety considerations and information specific to your gate operator, refer to the HySecurity gate operator product manuals.
  • Page 2 HyNet Components LED Indicators SFP Module (100/1000/2500) Height 1¼ inches Managed Switch Mounting Plate RJ-45 Integration Hub 4 x 7½ inches 4-Port Copper Gigabit Micro USB (100/1000/2500) RS-485 Reset Button Micro SD Card Slot USB OTG LED (position 1) Table 1: HyNet LED Indicators LED Position LED Color Indicates...
  • Page 3 SwingSmart DC and SlideSmart DC HyNet Assembly with Attachment Bracket HyNet Rain Shield Attachment Bracket HyNet Mounting Plate Tools Required • Phillips head screwdriver www.SecureOpeners.com | (800) 878-7829 | Sales@SecureOpeners.com...
  • Page 4 Mount HyNet to SwingSmart DC and SwingSmart DCS Remove covers Thread bracket screw into chassis. Place screw into slotted mounting hole on bracket. Secure HyNet assembly to chassis. Insert second screw through bracket and tighten. Connect wiring. See page 6. Tools Required •...
  • Page 5 Mount HyNet to SlideSmart DC and SlideSmart DCS Remove cover Tools Required • Phillips head screwdriver Thread bracket screw into chassis. Place screw into slotted mounting hole on bracket. Secure HyNet assembly to chassis. Insert second screw through bracket and tighten. Replace cover and Connect wiring.
  • Page 6 Wiring the HyNet Gateway HyNet Supply RJ-45 network RS-485 connection RS-485 port Connector Attach to RS-485 Pin 1, +24V port on HyNet. Smart DC Controller Installer supplied shielded cable Attach shielded cable to wire harness.* *Measure distance between HyNet and Controller connections COMMON for appropriate...
  • Page 7 Smart DC Controller HySecurity gate operators provide a 2-wire, serial interface (RS-485 connection) which allows remote access to one or more operators. When the physical connection is made and protocols are established, an SA (System Address) must be assigned for each operator through its Installer Menu.
  • Page 8 ’ nstaller heCklIst Date Installed: ________________ Gate Operator Model: _________________________________________________________________ Site Location: __________________________________________________________________________________________________________ HyNet Serial Number: ___________________________________ Gate Operator Serial Number: ___________________________ Gate Operator Serial Number: ___________________________ Gate Operator Serial Number: ___________________________ Gate Operator Serial Number: ___________________________ Customer Name: _______________________________________________________________________________________________________ Mailing Address: ________________________________________ Inspected by: ____________________________________________ ________________________________________________________...