USING AN EXISTING PAD
In many applications, SwingSmart may be a
replacement operator for an existing gate system.
Make sure the pad is level and inspect the pad for:
z Compliance with local building codes.
z Appropriate distance from the gate. Refer to
Figure 3.
z Appropriate dimensions for SwingSmart
installation.
z Durability.
To use an existing pad, take the following steps:
1. Remove any existing equipment from the pad.
2. Measure the pad to ensure it is sized properly
for SwingSmart.
3. Mark the center shaft location.
4. Follow the steps in Mounting the Operator.
CAUTION
Consider positioning the operator so existing
conduit exits through the cutout in the
SwingSmart base plate. Cutting small holes
in the base plate for pre-existing conduit is
permissible, but not recommended because
it can impair the strength of the chassis and
void the Limited Warranty.
27
| www.hysecurity.com
UNPACKING THE OPERATOR
Prepare the gate operator for installation. See
Figure 4.
1. Remove the top cap by unscrewing the knob.
2. Unfasten the side cover latches.
3. Remove the front cover.
4. Use a Phillips-head screwdriver to remove the
5. Remove the two wing nuts that secure the rear
6. Remove the four lag bolts and separate the
SWINGSMART DC PROGRAMMING AND OPERATIONS MANUAL
1
4
2
Rear Cover
6
Figure 4. Unpacking the Operator
two screws that secure the top of the rear cover.
Set the screws aside.
cover to the base plate and set the rear cover
aside. Set the wing nuts aside.
NOTICE
Do not lose the Phillips-head screws or wing
nuts as they are used to secure the rear cover
when the installation is complete.
operator from the shipping boards.
INSTALLATION
3
5
Front Cover
MX3640-01 REV. D ©2018