Delta Modulon DPH Series User Manual page 86

Three phase 15-60 kva 208vac
Hide thumbs Also See for Modulon DPH Series:
Table of Contents

Advertisement

9
Load
Load Grounding
Dual Input (Single Unit)
When there are two AC power sources, single unit wiring procedures are as follows.
1
2
3
4
Modulon DPH Series
NOTE:
For single input, the UPS will not work normally if the main AC source's
neutral (N).
Follow Figure 5-15 to ground the UPS, the external battery cabinet(s) and the
connected critical loads.
Load
Load
Load Grounding
Load Grounding
Protective Earthing
(Figure 5-15: Grounding Diagram_ Single Unit)
Follow
input into dual input.
Follow the procedures
Unit).
Connect the main AC source/ bypass AC source/ external battery cabinet/ output's
cables to the UPS. Please see Figure 5-16 and Figure 5-17.
NOTE:
For dual input, the UPS will not work normally if the main AC source and
to the UPS's Input neutral (N).
Follow Figure 5-15 to ground the UPS, the external battery cabinet(s) and the
connected critical loads.
UPS
External Battery
Cabinet Grounding
1
7
~
stated in the section of Single Input (Single
5-16
(At Maximum Four)
External
External
External
Battery
Battery
Battery
Cabinet
Cabinet
Cabinet
to modify the UPS from single
External
Battery
Cabinet

Advertisement

Table of Contents
loading
Need help?

Need help?

Do you have a question about the Modulon DPH Series and is the answer not in the manual?

Subscribe to Our Youtube Channel

Table of Contents