Figure 210: Positioning Of Core Balance Current Transformers - GE MiCOM P40 Technical Manual

P446sv
Hide thumbs Also See for MiCOM P40:
Table of Contents

Advertisement

P446SV

Figure 210: Positioning of core balance current transformers

If the cable sheath is terminated at the cable gland and directly earthed at that point, a cable fault (from phase to
sheath) will not result in any unbalanced current in the core balance CT. Therefore, prior to earthing, the
connection must be brought back through the CBCT and earthed on the feeder side. This then ensures correct
relay operation during earth fault conditions.
P446SV-TM-EN-1
Cable gland
Cable box
Cable gland/shealth
earth connection
No operation
SEF
SEF
E00614
Chapter 13 - Current Protection Functions
"Incorrect"
"Correct"
Operation