Section 14: SCPI command reference
:DTIMe <NRf>
This command specifies the discharge time for the specified test.
Usage
:TSEQuence:SRESistivity:DTIMe <NRf>
:TSEQuence:VRESistivity :DTIMe <NRf>
:DTIMe?
<NRf>
Details
This configuration command is used for the following tests:
Surface resistivity test
Volume resistivity test
:TSEQuence:SRESistivity:DTIMe specifies the discharge time for the surface resistivity test.
:TSEQuence:VRESistivity:DTIMe specifies the discharge time for the volume resistivity test.
:DTIMe? queries the discharge time.
Also see
None
:PDTime <NRf>
This command specifies the pre-discharge time for the specified test.
Usage
:TSEQuence:SRESistivity:PDTime <NRf>
:TSEQuence:VRESistivity:PDTime <NRf>
:PDTime?
<NRf>
Details
This command is used to specify the pre-discharge time for the specified test.
This configuration command is used for the following tests:
Surface resistivity test
Volume resistivity test
:TSEQuence:SRESistivity:PDTime specifies the pre-discharge time for the surface resistivity
test.
:TSEQuence:VRESistivity:PDTime specifies the pre-discharge time for the volume resistivity
test.
:PDTime? queries the pre-discharge time.
Also see
None
14-164
0 to 99999.9 (seconds)
0 to 99999.9 (seconds)
Model 6517B Electrometer Reference Manual
6517B-901-01 Rev. C / August 2015