Rack Installation Procedure - NEC Express5800/120Rd-2 Service Manual

Table of Contents

Advertisement

2-8 Setting Up Your Server

Rack Installation Procedure

Installation
Perform the following procedure to install the server into the rack:
IMPORTANT:
provided with the cable arm assembly.
Removing the Rail Assemblies
1.
The rail assemblies are shipped already mounted to the sides of the server. Each rail
assembly consists of a stationary rail attached to the server and a removable sliding rail.
Following Steps 2 and 3, remove the sliding rails from the server.
IMPORTANT:
inner rails later. To install each rail assembly on the correct inner rail,
mark each rail as removed. Similarly, when installing more than one
server, distinguish between the pairs of inner rails and rail assemblies of
the servers by marking the left and right hand rails.
2.
Hold the rails and slowly slide them toward the rear of the server until a "click" is heard.
The click indicates that the rails are in the locked position.
Push the release levers on the right and left sides of the rails, and remove the sliding rail
3.
assemblies from the server.
Note: The inner stationary rails remain screwed to the server when the rail assemblies have been
removed.
When installing the cable arm, see the instruction manual
The removed rail assemblies are to be installed on the
Release lever