Selecting A Server Site; Installation - NEC Express5800/120Rd-2 Service Manual

Table of Contents

Advertisement

SELECTING A SERVER SITE

Installation

To use the server, you must install it into a standard EIA 19-inch rack assembly.
Installation of a Rack
Refer to the rack installation documentation or contact your sales agent.
Observe the following instructions to use the server safely. Failure to follow
these instructions may result in serious personal injury.
Do not use the server in any unapproved location.
Do not connect the ground line to a gas pipe.
Observe the following instructions to install and use the server safely. Failure
to follow these instructions may cause a fire, personal injury, or property
damage.
Do not carry or install the server by yourself. Two persons are required to
safely carry or install this server.
Do not pull the server out of the rack if the rack is unstable.
Do not pull more than one device out from the rack at a time.
Ensure site wiring is adequate for the power rating of this server.
WARNING
CAUTION
Setting Up Your Server 2-3

Advertisement

Table of Contents
loading

Table of Contents