Relocating/Storing The Server - NEC Express5800/120Rd-2 Service Manual

Table of Contents

Advertisement

5-10 Maintenance

RELOCATING/STORING THE SERVER

Follow the procedure below to relocate or store the server:
Observe the following instructions to use the server safely. Failure to follow
these instructions may cause a fire, personal injury, or property damage
Never attempt to lift the server by yourself. Two people are required to safely
lift the server.
Do not install the server in any place other than specified.
Do not connect/disconnect any interface cable with the power cord of the
server plugged to a power source.
IMPORTANT:
If the server needs to be relocated/stored due to a change in the floor
!
layout to a great extent, contact the sales agent.
Make sure to make a backup copy of your valuable data in the hard
!
disk, if any.
Make sure not to apply a shock to hard disks to relocated the server if
!
the contains any.
Take a floppy disk and a CD-ROM out of the server, if any.
1.
2.
Power off the server (the POWER lamp goes off).
3.
Disengage the power cord from the tie wrap.
4.
Unplug the power cord of the server from a power outlet.
5.
Remove all the cables from the server.
6.
Remove the server from the rack cabinet.
See Chapter 3 for details.
7.
Hold the server by its bottom with at least another person to carry the server.
Protect the server with the shock-absorbing materials, and pack it securely.
8.
CAUTION

Advertisement

Table of Contents
loading

Table of Contents