Honda CR-V 1997 Service Manual page 591

Table of Contents

Advertisement

From page 14-74
I
LG11BR N/BLKI
PCM CONNECTORS
SHB IGRN/WHTI
Check Shift Control Solenoid
A 132PI
Valve B for a Short Circuit:
i'i2
3 '
F.Fo
1. Disconnect the 2P connector
from the shift control solenoid
i12V
15181718
valve NB assembly.
§
2.
Check for continuity between
22
232425
B 125PI
3 4 5
B
1112131415161718
the B11 and A9 or A22 termi-
LG21BR
nals.
N/BLKI " - - - - - - - { C l ) -_ _ _ --'
Wire side of female terminals
YES
Repair short to ground in the wire
"
Is there continuity?
/'
between the Bll terminal and the
shift control solenoid valve B.
NO
S HIFT CONTROL SOLENOID
AL VE AlB ASSEMBLY CONNECTOR
V
Measure Shift Control Solenoid
Valve B Resistance at the Sole-
noid Valve Connector:
Measure the resistance between
SH B IGRN/WHTI
the No.2 terminal of the connec-
tor and body ground.
Terminal side of male terminals
Check for open in the wire
"
YES
Is the resistance 12 - 25
m
/'
between the Bl 1 terminal and the
shift control solenoid valve B.
NO
Replace the shift control solenoid
valve AlB assembly.
14-75

Advertisement

Table of Contents
loading

This manual is also suitable for:

Cr-v 1998Cr-v 1999Cr-v 2000

Table of Contents