Honda CR-V 1997 Service Manual page 167

Table of Contents

Advertisement

8,
Coat the thrust washer surfaces
and
bolt threads
with oil.
9,
Install the main
bearing
caps,
Check clearance with plastigage (see
page
7-7),
then
t ighten the bearing cap
bolts
in
2
steps.
First step:
25 N'm (2.5 kgf·m, 18 Ibf.ft)
Second
step:
76 N'm (7.8 kgf·m, 56lbf.ftl
MAIN BEARING CAP BOLTS TIGHTENING SEQUENCE
NOTE: Whenever any
crankshaft
or
connecting
rod
bearing
is replaced
,
it is necessary after reassembly
to
run
the engine
at
idling speed
until
it
reaches
normal operating temperature,
then
continue to
run
it for approximately
15
minutes.
10, Clean and dry
the
right side cover mating surfaces.
11. Apply
liquid
gasket,
part No.
08718 - 0001
or
08718
-
0003,
evenly
to the
block mating surface of the
right
side cover and
to the
inner threads of
the
bolt
holes.
Install
it on the cylinder
block.
RIGHT
SIDE COVER
NOTE:
Apply
liquid
gasket al ong
the broken
line.
DOWEL PINS
RIGHT
SIDE
COVER
6x 1.0mm
9.B
Nom
11.0
kg/·m,
1.2
Ibf.ltJ
Do not
install
the parts if five minutes
or
more
have elapsed since applying the
liquid
gasket.
Instead, reapply liquid
gasket after removing the
old residue.
After
assembly,
wait at
least
30
minutes
before
filling the engine w ith oil.
(cont'
d)
7-21

Advertisement

Table of Contents
loading

This manual is also suitable for:

Cr-v 1998Cr-v 1999Cr-v 2000

Table of Contents