Oil Pressure Switch; Oil Cooler - Suzuki Grand Vitara XL-7 Service Manual

Hide thumbs Also See for Grand Vitara XL-7:
Table of Contents

Advertisement

6A3-20 ENGINE MECHANICAL (RHZ ENGINE)

OIL PRESSURE SWITCH

REMOVAL
1) Detach degassing tank from its bracket.
2) Disconnect oil pressure switch connector.
3) Remove oil pressure switch (1).
INSTALLATION
1) Install oil pressure switch (1) with new gasket (2).
2) Tighten oil pressure switch.
3) Connect connector.
4) Install degassing tank to its bracket.
5) Start engine and check for oil leakage.

OIL COOLER

REMOVAL
1) Drain engine coolant.
2) Detach degassing tank from its bracket.
3) Remove oil filter (1).
4) Disconnect hoses and remove oil cooler (2).
INSTALLATION
1) Install oil cooler (2) with new gasket.
2) Tighten cooler stud stand (3).
3) Connect hoses and tighten oil filter (1).
4) Install degassing tank to its bracket.
5) Fill engine coolant.
6) Check engine oil level. Refer to section 0B.
7) Check for oil leakage.

Advertisement

Table of Contents
loading

Table of Contents