Suzuki Grand Vitara XL-7 Service Manual page 239

Hide thumbs Also See for Grand Vitara XL-7:
Table of Contents

Advertisement

D Using new gasket (1), install water inlet box to cylinder block.
D Install high pressure supply pipe.
When tightening union nut, hold union nut of injection pump
with special tool.
Special Tool
(A): 09950-76510/OUT0000148
Tightening Torque
High pressure supply pipe union nut (a):
.
20 N
m (2.0 kg-m, 14.5 lb-ft)
D Install engine bracket.
Tightening Torque
Engine bracket bolts No.1 (a): 45 N
Engine bracket bolt No.2 (b): 20 N
D Adjust generator belt tension referring to Section 6H.
D Adjust A/C compressor belt tension (if equipped) referring to
Section 1B.
D Check to ensure that all removed parts are back in place. Rein-
stall any necessary parts which have not been reinstalled.
D Refill cooling system with coolant and A/T with specified A/T
fluid (vehicle with A/T).
D Connect negative cable at battery.
D Check to make sure that there is no fuel leakage, coolant leak-
age, oil leakage, A/T fluid leakage (vehicle with A/T) and ex-
haust gas leakage at each connection.
ENGINE MECHANICAL (RHZ ENGINE) 6A3-41
.
m (4.5 kg-m, 32.5 lb-ft)
.
m (2.0 kg-m, 14.5 lb-ft)

Advertisement

Table of Contents
loading

Table of Contents