Suzuki Grand Vitara XL-7 Service Manual page 222

Hide thumbs Also See for Grand Vitara XL-7:
Table of Contents

Advertisement

6A3-24 ENGINE MECHANICAL (RHZ ENGINE)
3) Fit oil pan to cylinder block using bolt (1) at the position as shown
in figure.
4) After fitting oil pan (1) to cylinder block, run in securing bolts (2)
and start tightening at the center: move wrench outward, tighten-
ing one bolt at a time.
Tighten bolts to specified torque.
Tightening Torque
.
(a): 16 N
m (1.6 kg-m, 11.5 lb-ft)
5) Install new gasket and drain plug (3) to oil pan.
Tighten drain plug to specified torque.
Tightening Torque
.
(b): 34 N
m (3.4 kg-m, 24.5 lb-ft)
6) Install suspension frame to chassis.
Tighten bolts to specified torque.
Tightening Torque
.
(a): 85 N
m (8.5 kg-m, 61.5 lb-ft)
7) Install knuckle (1), drive shaft (2) and suspension control arm (3)
referring to Section 3D.

Advertisement

Table of Contents
loading

Table of Contents