7A2-50 MANUAL TRANSMISSION
22) Install oil plate (1) to intermediate case.
"A": Cement 99000-32110
Tightening torque
Oil plate mounting bolts (a): 19 N
23) Insert reverse idler shaft (2) into reverse idler gear (1) and inter-
mediate case.
24) Insert 5th gear shift shaft (3) into 5th gear shift fork (2), reverse
gear shift link comp. (1) and intermediate case.
25) Fix new circlip (1) to 5th gear shift shaft by using rod or the like
and hammer.
26) Drive pin into 5th gear shift fork (1) and 5th gear shift shaft (2)
by using special tool.
Special tool
(A): 09922-85811
.
m (1.9 kg-m, 14.0 lb-ft)