Mitsubishi Stealth 1994 Import Service Manual page 70

Table of Contents

Advertisement

FRONT SUSPENSION -
RIGHT MEMBER, LEFT MEMBER AND CROSSMEMBER
REMOVAL AND INSTALLATION
CAUTION: SRS
Before removal of steering gear box,
refer to GROUP 23B - SRS, center front
wheels and remove ignition key.
Failure to do so may damage SRS clock
spring and render SRS system inopera-
tive, risking serious driver injury.
No. 1 cross member, Left member,
Right member
60-70 Nm
43 - 51 ft.lbs.
12
q
I8
90 Nm
65 ftlbs.
60-70 N
43 - 51 ft.lbs.
of No. 1 crossmember, left member,
Removal steps
right member
1. Cover installation screw
2. Left member
3. Connection of clutch vacuum hose <Turbo>
4. Vacuum tank installation bolt <Turbo>
5. Right member
6. Vacuum tank <Turbo>
7. Front roll stopper installation bolt
8. No. 1 crossmember installation nut
9. Lower plate
12. Bushing (B)
Right Member, Left Member and Crossmember
7
2
6 0 - 7 0 N m '
43 - 51 ft.lbs.
Removal steps of front exhaust pipe
Refer to GROUP 11 - Exhaust Pipe and Main Muffler.
Removal steps of transfer assembly
Refer to GROUP 21 -Transfer.
Removal steps of stabilizer bar
Refer to P.2A-32.
Removal steps of steering gear box assembly
Refer to GROUP 19A - Steering Gear Box.
Pre-removal Operation
Removal of Under Cover
l
Post-installation Operation
Installation of Under Cover
l
Air Bleeding of the Power-steering
l
Fluid (Refer to GROUP 19A-
Service Adjustment Procedures.)
Adjustment of the Front Wheel
l
Alignment (Refer to P.2A-9.)
Supplying of Transfer Oil <AWD>
l
(Refer to GROUP 0 -Maintenance
Service.)
60-70 Nm
43 - 51 ft.lbs.

Advertisement

Table of Contents
loading

Table of Contents