LEFT CRANKCASE COVER
INSTALLATION
Route
the WIres
properly (page
1-
23)
Install a new gasket and
dowel
pins.
Install
the
left crankcase cover
and
bolts.
Tighten the left crankcase cover bolts in a crisscross
panern in
two
or three steps.
Connect the ignition
pulse
generator 2P (Black) con-
nector and alternator 4P (Black) connector.
Clamp the wire with the band.
Install
the following:
-
Gearshift pedal (page 10-28)
-
Engine
guard (page 2-4)
-
Fuel tank
(page 2-7)
Fill
the engine with
the recommended
engine oil
(page
3·
1
7).
ALTERNATOR
11-7