Preparing The Site For The Srx5600 Services Gateway Installation; Site Preparation Checklist For The Srx5600 Services Gateway - Juniper SRX5600 Hardware Manual

Services gateway
Hide thumbs Also See for SRX5600:
Table of Contents

Advertisement

CHAPTER 4
Preparing the Site for the SRX5600
Services Gateway Installation

Site Preparation Checklist for the SRX5600 Services Gateway

Table 22: Site Preparation Checklist
Item or Task
Verify that environmental factors such as
temperature and humidity do not exceed
services gateway tolerances.
Select the type of rack or cabinet.
Plan rack or cabinet location, including required
space clearances.
If a rack is used, secure rack to floor and building
structure.
Acquire cables and connectors.
Copyright © 2010, Juniper Networks, Inc.
This section includes the following topic:
Site Preparation Checklist for the SRX5600 Services Gateway on page 45
SRX5600 Services Gateway Rack Requirements on page 46
SRX5600 Services Gateway Cabinet Requirements on page 50
The checklist in Table 22 on page 45 summarizes the tasks you need to perform when
preparing a site for services gateway installation.
For More Information ...
"SRX5600 Services Gateway
Environmental Specifications" on
page 203
"SRX5600 Services Gateway Cabinet
Size and Clearance Requirements"
on page 50,
"SRX5600 Services Gateway Rack
Size and Strength Requirements" on
page 47
"Clearance Requirements for
SRX5600 Services Gateway Airflow
and Hardware Maintenance" on
page 49
"Connection to Building Structure for
the SRX5600 Services Gateway
Rack" on page 49
Performed By
Date