CHAPTER 4
Preparing the Site for the SRX5600
Services Gateway Installation
Site Preparation Checklist for the SRX5600 Services Gateway
Table 17: Site Preparation Checklist
Item or Task
Verify that environmental
factors such as temperature
and humidity do not exceed
services gateway tolerances.
Select the type of rack or
cabinet.
Plan rack or cabinet location,
including required space
clearances.
If a rack is used, secure rack
to floor and building structure.
Acquire cables and
connectors.
Copyright © 2014, Juniper Networks, Inc.
Site Preparation Checklist for the SRX5600 Services Gateway on page 41
SRX5600 Services Gateway Rack Requirements on page 42
SRX5600 Services Gateway Cabinet Requirements on page 46
The checklist in
Table 17 on page 41
preparing a site for services gateway installation.
For More Information ...
"SRX5600 Services Gateway
Environmental Specifications"
on page 227
"SRX5600 Services Gateway
Cabinet Size and Clearance
Requirements" on page
46,
"SRX5600 Services Gateway
Rack Size and Strength
Requirements" on page 43
"Clearance Requirements for
SRX5600 Services Gateway
Airflow and Hardware
Maintenance" on page 45
"Connection to Building
Structure for the SRX5600
Services Gateway Rack" on
page 45
summarizes the tasks you need to perform when
Performed By
Date