Juniper SRX5400 Hardware Manual page 58

Services gateway
Hide thumbs Also See for SRX5400:
Table of Contents

Advertisement

SRX5400 Services Gateway Hardware Guide
Related
Documentation
44
NOTE:
The device is maximally protected inside the shipping crate. Do not
unpack it until you are ready to begin installation.
To unpack the device, follow these steps (see
Move the shipping crate to a staging area as close to the installation site as possible,
1.
where you have enough room to remove the components from the chassis. While the
chassis is bolted to the pallet, you can use a forklift or pallet jack to move it.
Position the shipping crate with the arrows pointing up.
2.
Open all the latches on the shipping crate.
3.
Remove the front door of the shipping crate cover and set it aside.
4.
Slide the remainder of the shipping crate cover off the pallet.
5.
Remove the foam covering the top of the device.
6.
Remove the accessory box and the SRX5400 Services Gateway Getting Started Guide.
7.
Verify the parts received as described in
8.
Parts Received" on page
Remove the vapor corrosion inhibitor (VCI) packs attached to the pallet, being careful
9.
not to break the VCI packs open.
To remove the brackets holding the chassis on the pallet, use a 1/2-in. socket wrench
10.
and a number 2 Phillips screwdriver to remove the bolts and screws from the brackets.
Store the brackets and bolts inside the accessory box.
11.
Save the shipping crate cover, pallet, and packing materials in case you need to move
12.
or ship the device at a later time.
Figure 18: Contents of the Shipping Crate
Tools and Parts Required to Unpack the SRX5400 Services Gateway on page 43
Overview of Installing the SRX5400 Services Gateway on page 33
Site Preparation Checklist for the SRX5400 Services Gateway on page 35
Verifying the SRX5400 Services Gateway Parts Received on page 45
Figure 18 on page
"Verifying the SRX5400 Services Gateway
45.
44):
Copyright © 2014, Juniper Networks, Inc.

Advertisement

Table of Contents
loading

Table of Contents