4
RemovingthePrimaryTransferRoller(C,M,Y)
BeforeremovingthePrimaryTransferRoller(C,M,Y)
•
OpentheFrontCover,RightLowerCoverandRightUpperCover
•
RemovetheITBCover
•
RemovetheITBUnit
•
RemovetheITBCleaningUnit
Howtoremove
MEMO:
ThisproceduredescribesthestepsforPrimaryTransferRoller(C).Gothroughthe
sameprocedureforMandY.
Caution:
DonottouchthesurfaceofDriveRoller,SecondaryTransferInnerRollerandPrimary
TransferRollerasitmaycausetheimagefailure.
4
1)Pulloutthepin,maketheSecondaryTransferInnerRollerUnitstraightandinstallthe
removedpin.
2)RemovetheITBUnitfromtheITBCoverandplaceitontothepaper.
•
2claws
x2
Claws
ITB cover
3)TurntheITBSubPressureReleaseLevertomakethePrimaryTransferRoller(C,M,Y)
lifted.
Primary transfer roller(C)
Primary transfer roller(M)
4-97
F-4-129
ITB unit
Paper
F-4-130
Primary transferr oller(Y)
ITB sub pressure release lever
F-4-131
4-97