Factory Five Racing GTM Supercar Assembly Manual page 448

Table of Contents

Advertisement

Apply a bead of silicone to just the top edge of the Dash Bulkhead tube. Set the panel in place. Drill the
frame using the holes in the aluminum panel as a reference and rivet the panel to the frame.
Install the foot box top piece. This piece is riveted around the outside to the frame as well as to the upper
flanges on the multiple footbox pieces. You are going to have to mark these flanges on the bottom surface
of the piece and then drill for
1
/
" rivets.
8
439
www.factoryfive.com
508-291-3443

Advertisement

Table of Contents
loading

Table of Contents