Gauge Panel - Factory Five Racing GTM Supercar Assembly Manual

Table of Contents

Advertisement

Gauge panel

Apply some masking tape to the edges of the gauge panel and drill four
the top of the dash face and 1 on either side of the dash face near the bottom just before the panel begins
to wrap under the dash.
After you drill the first hole, place a
a rivet gun) to hold the dash face in position. This will keep the holes aligned as you drill the rest
of the holes and will make bolting the face down much easier.
Remove the gauge panel from the dash pod. Open up the holes you drilled in the flange with a
bit and install four of the 10-32 fine thread Rivnuts (from the secondary body fasteners assembly) in the
dash pod mounting flange.
3
/
" rivet in the hole (just place it in the hole, do not set it with
16
693
www.factoryfive.com
508-291-3443
3
/
" holes in the gauge panel, 2 at
16
19
/
" drill
64

Advertisement

Table of Contents
loading

Table of Contents