Starter Motor Removal and Installation
Removal
1) Turn the ignition switch OFF and disconnect the
battery (–) lead wire. Refer to "Battery Removal and
Installation in Section 1J (Page 1J-13)".
2) Remove the fuel tank. Refer to "Fuel Tank Removal
and Installation in Section 1G (Page 1G-9)".
3) Disconnect the starter motor lead wire (1).
4) Remove the starter motor (2).
1
Installation
Install the starter motor in the reverse order of removal.
Pay attention to the following points:
• Apply grease to the O-ring.
: Grease 99000–25010 (SUZUKI SUPER
GREASE A or equivalent)
CAUTION
!
Replace the O-ring with a new one.
• Tighten the starter motor mounting bolts (1) to the
specified torque.
Tightening torque
Starter motor mounting bolt (a): 10 N·m (1.0 kgf-
m, 7.0 lb-ft)
B838H21906002
2
I837H1190001-01
I837H1190002-01
• Tighten the starter motor lead wire mounting bolt (2) to
the specified torque.
Tightening torque
Starter motor lead wire mounting nut (b): 6 N·m (
0.6 kgf-m, 4.5 lb-ft)
2
(b)
• Install the starter motor. Refer to "Wiring Harness
Routing Diagram in Section 9A (Page 9A-3)".
Starter Motor Disassembly and Assembly
Refer to "Starter Motor Removal and Installation
(Page 1I-4)".
Disassembly
Disassemble the starter motor as shown in the starter
motor components diagram. Refer to "Starter Motor
Components (Page 1I-3)".
Assembly
Reassemble the starter motor in the reverse order of
removal. Pay attention to the following points:
CAUTION
!
Replace the O-rings with new ones to prevent
oil leakage and moisture.
• Apply grease to the lip of the oil seal.
: Grease 99000–25010 (SUZUKI SUPER
GREASE A or equivalent)
Starting System:
1I-4
1
(a)
I837H1190003-01
B838H21906003
I837H1190004-01