11.3

Replacing the heat sink

Field Replaceable Units (FRU)
Average task duration: 15 minutes
V
CAUTION!
Follow the safety instructions in chapter
page
43.

11.3.1 Required tools

Preliminary and concluding steps: tool-less
Main steps:
– Phillips PH2 / (+) No. 2 screw driver
– lint-free cloth

11.3.2 Preliminary steps

Ê Perform the following procedures:
1.
"Opening the rack door" on page 59
2.
"Locating the defective server" on page 55
3.
"Shutting down the server" on page 59
4.
"Extending/removing the server from the rack" on page 60
5.
"Opening the server" on page 64

11.3.3 Removing the riser module 1

Ê Remove the riser module 1 as described in section
module 1" on page
RX100 S7
281.
Upgrade and Maintenance Manual
"Important information" on
"Removing the riser
Processor
293