Removing A Memory Module; Concluding Steps; Required Tools - Fujitsu PRIMERGY RX100 S7 Upgrade And Maintenance Manual

Server
Hide thumbs Also See for PRIMERGY RX100 S7:
Table of Contents

Advertisement

Main memory

10.2.5 Concluding steps

Ê Perform the following procedures:
1.
"Closing the server" on page 66
2.
"Installing the server in the rack" on page 68
3.
"Updating the system board BIOS and iRMC" on page 81
4.
"Enabling SVOM boot watchdog functionality" on page 89
5.
"Switching on the server" on page 72
6.
"Enabling BitLocker functionality" on page 94
7.
"Closing the rack door" on page 73
10.3

Removing a memory module

Upgrade and Repair Units (URU)
Average task duration: 5 minutes
V
CAUTION!
Follow the safety instructions in chapter
page
43.

10.3.1 Required tools

Preliminary and concluding steps: tool-less
Main steps: tool-less
274
Upgrade and Maintenance Manual
"Important information" on
RX100 S7

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents