Front Vga/Lan Module; Installing The Front Vga/Lan Module; Required Tools; Preliminary Steps - Fujitsu PRIMERGY RX100 S7 Upgrade And Maintenance Manual

Server
Hide thumbs Also See for PRIMERGY RX100 S7:
Table of Contents

Advertisement

Management and diagnostics modules
14.3

Front VGA/LAN module

14.3.1 Installing the front VGA/LAN module

Upgrade and Repair Units (URU)
Average task duration: 5 minutes
V
CAUTION!
Follow the safety instructions in chapter
page
43.

14.3.1.1 Required tools

Preliminary and concluding steps: tool-less
Main steps: tool-less

14.3.1.2 Preliminary steps

Ê Perform the following procedures:
1.
"Opening the rack door" on page 59
2.
"Disabling BitLocker functionality" on page 75
3.
"Shutting down the server" on page 59
4.
"Extending/removing the server from the rack" on page 60
5.
"Opening the server" on page 64
328
Upgrade and Maintenance Manual
"Important information" on
RX100 S7

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents