Installing The Fbu; Required Tools; Preliminary Steps - Fujitsu PRIMERGY RX100 S7 Upgrade And Maintenance Manual

Server
Hide thumbs Also See for PRIMERGY RX100 S7:
Table of Contents

Advertisement

9.5.2

Installing the FBU

Upgrade and Repair Units (URU)
Average task duration: 15 minutes
V
CAUTION!
Do not connect the cable using excessive force, the connector is
weak.
Follow the safety instructions in chapter
page
43.
9.5.2.1

Required tools

Preliminary and concluding steps: tool-less
Installing FBU: tool-less
Installing TFM: Phillips PH1 / (+) No.1 screw driver
9.5.2.2

Preliminary steps

Ê Perform the following procedures:
1.
"Opening the rack door" on page 59
2.
"Disabling SVOM boot watchdog functionality" on page 76
3.
"Shutting down the server" on page 59
4.
"Extending/removing the server from the rack" on page 60
5.
"Opening the server" on page 64
RX100 S7
Upgrade and Maintenance Manual
Expansion cards and backup units
"Important information" on
245

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents