16.10 Replacing the BBU cable

Field Replaceable Units (FRU)
Average task duration: 10 minutes
V
CAUTION!
Follow the safety instructions in chapter
page
43.

16.10.1 Required tools

Preliminary and concluding steps: tool-less
Main steps: Phillips PH00 / (+) No. 00 screw driver

16.10.2 Preliminary steps

Ê Perform the following procedures:
1.
"Opening the rack door" on page 59
2.
"Locating the defective server" on page 55
3.
"Shutting down the server" on page 59
4.
"Extending/removing the server from the rack" on page 60
5.
"Opening the server" on page 64