Removing The Fbu; Required Tools; Preliminary Steps - Fujitsu PRIMERGY RX100 S7 Upgrade And Maintenance Manual

Server
Hide thumbs Also See for PRIMERGY RX100 S7:
Table of Contents

Advertisement

9.5.4

Removing the FBU

Upgrade and Repair Units (URU)
Average task duration: 15 minutes
V
CAUTION!
Do not connect the cable using excessive force, the connector is
weak.
Dispose of used battery properly. Keep away from children.
Do not throw battery backup units into the trash can. Batteries must
be disposed of in accordance with local regulations concerning
special waste.
Follow the safety instructions in chapter
page
43.
9.5.4.1

Required tools

Preliminary and concluding steps: tool-less
Main steps: tool-less
9.5.4.2

Preliminary steps

Ê Perform the following procedures:
1.
"Opening the rack door" on page 59
2.
"Shutting down the server" on page 59
3.
"Extending/removing the server from the rack" on page 60
4.
"Opening the server" on page 64
RX100 S7
Upgrade and Maintenance Manual
Expansion cards and backup units
"Important information" on
255

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents