Replacing The Sata Cable For The Odd; Concluding Steps; Required Tools - Fujitsu PRIMERGY RX100 S7 Upgrade And Maintenance Manual

Server
Hide thumbs Also See for PRIMERGY RX100 S7:
Table of Contents

Advertisement

16.3.5 Concluding steps

Ê Perform the following procedures:
1.
"Closing the server" on page 66
2.
"Installing the server in the rack" on page 68
3.
"Switching on the server" on page 72
4.
"Closing the rack door" on page 73
16.4

Replacing the SATA cable for the ODD

Upgrade and Repair Units (URU)
Average task duration: 5 minutes
V
CAUTION!
Follow the safety instructions in chapter
page
43.

16.4.1 Required tools

Preliminary and concluding steps: tool-less
Main steps: tool-less
RX100 S7
Upgrade and Maintenance Manual
"Important information" on
Cables
399

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents