9.4.5
Replacing an expansion card in riser module 1
Upgrade and Repair Units (URU)
Additional task duration for FW update: 5 minutes
Average task duration: 10 minutes
V
CAUTION!
Before installing/removing expansion cards to/from the server, turn
●
off the server, all peripheral devices, and any other connected
devices. Also unplug all power cables from the outlet. Failure to do so
can cause electric shock.
The circuit boards and soldered parts of internal options are exposed
●
and can be damaged by static electricity. Before handling them, first
touch a metal part on the server to discharge static electricity from
your body.
Do not touch the circuitry on boards and soldered parts. Hold the
●
metallic areas or the edge of the circuit boards.
Follow the safety instructions in chapter
●
page
43.
Note on network settings recovery
The following notes are required for RX100 S7p (PYR10Pxxx for Japanese
market).
I
When replacing network controllers or the system board, network
configuration settings in the operating system will be lost and replaced
by default values. This applies to all static IP address and LAN teaming
configurations.
Ensure to note down your current network settings before replacing a
network controller or the system board.
9.4.5.1
Required tools
Preliminary and concluding steps: tool-less
●
Main steps: tool-less
●
RX100 S7
Upgrade and Maintenance Manual
Expansion cards and backup units
"Important information" on
217