14.2.2.6 Concluding steps

Ê Perform the following procedures:
1.
"Closing the server" on page 66
2.
"Installing the server in the rack" on page 68
3.
"Switching on the server" on page 72
4.
"Closing the rack door" on page 73

14.2.3 Replacing the LSP

Field Replaceable Units (FRU)
Average task duration: 5 minutes
V
CAUTION!
Follow the safety instructions in chapter
page
43.

14.2.3.1 Required tools

Preliminary and concluding steps: tool-less
Main steps: tool-less

14.2.3.2 Preliminary steps

Ê Perform the following procedures:
1.
"Opening the rack door" on page 59
2.
"Locating the defective server" on page 55
3.
"Shutting down the server" on page 59
4.
"Extending/removing the server from the rack" on page 60
5.
"Opening the server" on page 64
RX100 S7