Replacing The Ufm; Required Tools; Preliminary Steps - Fujitsu PRIMERGY RX100 S7 Upgrade And Maintenance Manual

Server
Hide thumbs Also See for PRIMERGY RX100 S7:
Table of Contents

Advertisement

System board and components

15.2.3 Replacing the UFM

Field Replaceable Units (FRU)
Additional task duration for uploading "Recovery CD" image:
5 minutes
Average task duration: 5 minutes
V
CAUTION!
Follow the safety instructions in chapter
page
43.

15.2.3.1 Required tools

Preliminary and concluding steps: tool-less
Main steps:
– Phillips PH1 / (+) No. 1 screw driver
– long nose pliers
– combination pliers

15.2.3.2 Preliminary steps

Ê Perform the following procedures:
1.
"Opening the rack door" on page 59
2.
"Locating the defective server" on page 55
3.
"Disabling SVOM boot watchdog functionality" on page 76
4.
"Disabling BitLocker functionality" on page 75
5.
"Shutting down the server" on page 59
6.
"Extending/removing the server from the rack" on page 60
7.
"Opening the server" on page 64
358
Upgrade and Maintenance Manual
"Important information" on
RX100 S7

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents