Management and diagnostics modules
14.3.3 Replacing the front VGA/LAN module
Field Replaceable Units (FRU)
Average task duration: 5 minutes
V
CAUTION!
Follow the safety instructions in chapter
page
43.
14.3.3.1 Required tools
Preliminary and concluding steps: tool-less
●
Main steps: tool-less
●
14.3.3.2 Preliminary steps
Ê Perform the following procedures:
1.
"Opening the rack door" on page 59
2.
"Locating the defective server" on page 55
3.
"Disabling BitLocker functionality" on page 75
4.
"Shutting down the server" on page 59
5.
"Extending/removing the server from the rack" on page 60
6.
"Opening the server" on page 64
14.3.3.3 Removing the riser module 1
Ê Remove the riser module 1 as described in section
module 1" on page
14.3.3.4 Removing the front LAN card
Ê Remove the front LAN card as described in section
card" on page
340
336.
336.
Upgrade and Maintenance Manual
"Important information" on
"Removing the riser
"Removing the front LAN
RX100 S7