MERLIN LEGEND Communications System Release 5.0
Maintenance and Troubleshooting 555-650-140
Control Unit Problems
800 NI-BRI Module Problems
Console Display/Instructions
If the test cannot be run to completion, an error message screen
appears, such as the one shown below:.
Provisioning slot xx :
Test running too long
Exit
Find the error message in
Table 4-6. NI BRI Provisioning Test Errors
Error Messages
Slot is not busied-out
Slot empty or not valid
Test running too long
Test won't start
(applies to Release 4.1 and later)
xx = slot number entered in
Step 2
Table 4-6
and proceed as indicated.
Corrective Action
Exit the test, busy-out the slot, and try again.
Exit the test and try again. Be sure to type the correct slot
number; do not indicate an empty slot or the processor
(00). If the problem persists, replace the 800 NI-BRI
module.
Exit the test. Remove half of the DSL connectors and
rerun the test. Note the result codes of those that fail and
then disconnect them. Reconnect the untested DSLs and
rerun the test. Note those that fail. Reconnect all DSLs.
Check that all BRI boards not being tested are busied out
and unplugged from the carrier. Run the test again.
Additional Information
Issue 1
June 1997
Page 4-82
PC
!
Need help?
Do you have a question about the MERLIN LEGEND Release 5.0 and is the answer not in the manual?