Mitsubishi Electric A1SD75P1-S3 User Manual page 353

Positioning module
Table of Contents

Advertisement

9 MAIN POSITIONING CONTROL
Setting item
New current value
Cd.15
Positioning start
Cd.11
No.
* Refer to section "5.7 List of control data" for details on the setting details.
Positioning start signal
PLC READY signal
AD75 READY signal
Positionig start complete signal
BUSY signal
Positioning complete signal
Error detection signal
Fig. 9.13 Current value change using the start No. (No. 9003) for a current value change
Artisan Technology Group - Quality Instrumentation ... Guaranteed | (888) 88-SOURCE | www.artisantg.com
Setting method for the current value change function
The following shows an example of a sequence program and data setting to
change the current value to a new value with the positioning start signal. (The
" Md.29 Current feed value is changed to "5000.0 µ m" in the example shown.)
(1) Set the following data.
(Set with the sequence program shown in (3), while referring to the start time
chart shown in (2).)
Setting
value
50000 Set the new " Md.29 Current feed value".
Set the start No. "9003" for the current value
9003
change.
(2) The following shows a start time chart.
V
[Y10]
[Y1D]
[X0]
[X1]
[X4]
[X7]
[XA]
Md.29 Current feed value
Cd.11 Positioning start No.
Cd.15 New current value
Setting details
Address during positioning execution
Data No. during positioning execution
9 - 57
MELSEC-A
Buffer memory address
Axis 1 Axis 2 Axis 3
1154
1204
1254
1155
1205
1255
1150
1200
1250
Start of data No. 9003
t
50000
9003
50000

Advertisement

Table of Contents
loading

This manual is also suitable for:

A1sd75p2-s3A1sd75p3-s3Ad75p1-s3Ad75p2-s3Ad75p3-s3

Table of Contents