Installing The Cps6000 Shelf - ABB CPS6000 Product Manual

-48v indoor/outdoor power shelf
Hide thumbs Also See for CPS6000:
Table of Contents

Advertisement

Installing the CPS6000 Shelf

CPS6000 Unpacking and Installation
There are two distribution options for the CPS6000, a Single-Slot Distribution Module and a Bulk
Output Module. Only one distribution box can be used in a CPS6000 shelf. This hardware assembly is
field installable, however in most cases the factory will have already installed the distribution module
when it is required.
Step
Action
Unpacking. Inspect the shipping container for any signs of damage. If damage exists, have the carrier's
1.
representative sign a note acknowledging the damage.
Carefully cut the sealing tape and remove the shelf from the carton. Use the parts list to verify all
2.
materials are included. Save the shipping package until all parts are operating within specifications.
3.
Is there a Distribution Module already installed in the right-most shelf position?
Yes - Go to the Install the CPS6000 shelf section.
Remove the Distribution Module Assembly from the carton. The Assembly and the shelf will be shipped
4.
in separate cartons.
5.
Is the Single-Slot or the Bulk Output Distribution Module being installed?
Bulk Output Distribution Module - Go to Step 8.
6.
Slide the Assembly into the rightmost slot.
7.
Verify the hook on the front engages under the shelf. See Figure 5-1.
Page 38
© Copyright 2021 ABB. All rights reserved.
Single - Wide Distribution Module
Ensure that the hook on the
front of the Distribution Module
catches under the shelf
Figure 5-1: Distribution Module
No – Continue
Single-Slot or Double-Slot Distribution
Module - Continue.

Advertisement

Table of Contents
loading

Table of Contents