10
I S O T X F O R P O W E R VA L U E R T G 2 U L 5 - 1 0 K VA
—
4 3 Checking the accessory kit
Unpack the package and check the package contents. The shipping package contains:
•
Mounting ear (left) x 1, Mounting ear (right) x 1
•
Mounting ear screws x 8
•
Cable glands x 2 for 6K (x 3 for 10K)
•
Temperature signal cable x 1
•
Foot extend(long) x 4
•
Foot extend(short) x 4
•
Rail slide (left) x 1
•
Rail slide (Right) x 1
•
Screw(M6) x 14
•
Nut(M6) x 4
—
4 4 Installing the ISO TX
—
4 4 1
Installing in the rack position
Step 1: Install mounting ears to the side mounting holes of the Transformer box using the
—
4.4.1-1
screws provided, mounting ears should face forward.
Step 1
—
4.4.1-1
STATUS:
Approved
© Copyright 2022 ABB. All rights reserved.
SECURITY LEVEL:
Public
DOCUMENT ID:
4NWD005663
REV:
LANG:
PAGE:
10 / 18
A
EN