Battery Strings Installation - ABB CPS6000 Product Manual

-48v indoor/outdoor power shelf
Hide thumbs Also See for CPS6000:
Table of Contents

Advertisement

Route Ringer Load Cable through
upper or lower notches in Ringer
and Distribution Module Chassis
Ringer Chassis
Ringer Load Cable
Connector

Battery Strings Installation

Up to four battery strings can be connected to the CPS6000 Distribution Module.
Warning: Batteries contain hazardous electrical energy, sulfuric acid, and explosive hydrogen gas.
Follow all precautions noted in the manufacturer's literature accompanying the batteries.
Warning: If a battery disconnect switch is being used, mount the switch before proceeding and make
sure it is in the OFF/OPEN position prior to making any connections.
Connect Battery Strings
This procedure is used to connect up to four battery strings to the CPS6000.
Step
Action
If battery circuit breakers are required, remove the straps installed by the factory and install the
1.
bullet-style circuit breakers into the bottom two positions in the Distribution Module. See Figure 5-19.
Caution: Turn the circuit breakers to the OFF position until the unit is ready to be energized.
2.
Place batteries on the battery trays in a 48 V string arrangement per manufacturer's instructions.
Make battery string V- and RTN connections to the Distribution Module. Refer to the appropriate Figures
3.
5-19b through 5-19e for battery string connections to Distribution Modules.
5.
Secure the cables to the battery terminals with M6 nuts. Torque to 65 in-lb (7.3 Nm).
Page 59
© Copyright 2021 ABB. All rights reserved.
Distribution Module
Figure 5-18: Ringer Load Cable and Routing
Ring (Black)
Tip (Brown)
EGND - Chassis (Bare)
Ringer Load Cable

Advertisement

Table of Contents
loading

Table of Contents