Load Connections - ABB CPS6000 Product Manual

-48v indoor/outdoor power shelf
Hide thumbs Also See for CPS6000:
Table of Contents

Advertisement

Battery Circuit
Breaker Position
See Note

Load Connections

Loads can be connected using 2 bullet-style circuit breakers, GMT fuses or Direct Bus Connections.
Double-Slot Distribution Module Note
Check if Double-Slot Distribution Module positions can be used for load positions, make connections
as described here. Positions are converted from battery to a load positions using an adapter on the
circuit breaker. This is described in the section, "Installing Circuit Breakers and Fuses."
Terminate Load Connections - Bullet-Style Circuit Breakers
Two Circuit Breakers can be installed in the top two positions in the Distribution Module. The load
terminals on the circuit breakers can secure cabling from 18 AWG (1mm
Step
Action
1.
Insert Load breakers in the top two positions in the Distribution Module.
Terminate the load cables on the load buss with M6 nuts and torque to 65 in-lb (7.3Nm). See Appropriate
2.
Figures 5-20a, through 5-20c for Distribution Module connections.
Page 62
© Copyright 2021 ABB. All rights reserved.
String 4
String 3
String 2
String 1
Note :Positions 3 and 4 are note available for battery
staring connection in distribution module equipped
with Low– voltage Load Distribution (LVLD)
Figure 5-19e: Battery String Connections – Double-Slot
Route Battery V– Cables
Route Battery Return Cables
Battery Power
RTN
V-
Battery and
Return Cables
String 4
See Note
String 3
String 2
String 1
2
) to No. 2 AWG (33mm
2
).