Initial Start-up

The system is ready to be powered up. Please verify all connections are as described prior to applying
ac power.
Step
Action
If using battery disconnect switches place them in their ON/CLOSED positions prior to applying ac
1.
power.
2.
Turn on the ac service circuit breakers to apply power to the CPS6000 power system.
Verify that All LEDs on all components including rectifiers, controllers, LVD boards, and remote voltage
3.
monitor modules are green.
Verify that the reading on the controller display is 54.5 V
4.
fully charged, the voltage may be lower. If possible, open the external disconnect switches or activate the
disconnect switches in the Distribution Module prior to making measurements.
5.
If the conditions in Steps 3 and 4 are not met refer to Section 13, Troubleshooting.
Refer to Section 6 for changing system parameters from the default settings if required (float voltages,
6.
alarm thresholds, controller settings, etc.)
Page 74
© Copyright 2021 ABB. All rights reserved.
Amperage
3
5
10
15
16
20
25
30
40
45
50
60
70
80
90
100
125
150
200
250
CB Positions
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
2
2
3
3
. Note that if the connected batteries are not
dc
Min Wire Gauge
10
10
10
10
10
10
10
10
10
8
8
6
6
4
4
2
2
1/0
2/0
4/0

Advertisement

Table of Contents
loading

Table of Contents