10.6 Start program for high-level positioning control

10.6.1 Starting high-level positioning control

PLC CPU
1) Set "7000" in " Cd. 3 Positioning start No.".
(This establishes that the control as "high-level positioning control" using block start data.)
2) Set the point No. of the "block start data" to be started. (In this case "1".)
3) Turn ON the start signal.
4) The positioning data set in the "1st point block start data" is started.
To execute high-level positioning control, a sequence program must be created to start
the control in the same method as for major positioning control.
The following shows the procedure for starting the "1st point block start data"
(regarded as block No. 7000) set in axis 1.
QD77GF
Buffer memory
1)
7000
4300
2)
1
4301
3)
ON
Input/output signal
Y10
Fig. 10.2 High-level positioning control start procedure
Chapter 10 High-Level Positioning Control
4)
Control by designated
positioning data
When carrying out a positioning start with the next
scan after a positioning operation is completed,
input the start complete signal ( Md.31 Status:b14)
as an interlock so that the start is carried out once
the start complete signal ( Md.31 Status:b14)
turns OFF after the Y10 signal turns OFF.
10 - 22