Download Print this page

Chrysler DODGE D150 1993 Service Manual page 1314

Advertisement

TRANSMISSION OVERHAUL-46RH
21 - 313
TUBE BRACE
UPPER
LOWER
H O U S I N G
PORT
J932M62
Fig. 121 Boost Valve Tube Installation—46RH
springs and clutch valve plug are properly seated
(Fig. 123).
RIGHT-SIDE SCREW
3-4 ACCUMULATOR
Fig. 122 Installing Converter Clutch And 3-4 Shift
Valve Springs—46RH
CLUTCH
ACCUMULATOR
VALVE PLUG
BOSS
J9321-161
Fig. 123 Seating 3-4 Accumulator On Lower
Housing—46RH
(6) Attach solenoid case connector to 3-4 accumula­
tor with shoulder-type screw. Connector h a s small lo­
cating tang t h a t fits in dimple at top of accumulator
housing (Fig. 124). Seat t a n g in dimple before tight­
ening connector screw.
(7) Install solenoid assembly and gasket. Tighten
solenoid attaching screws to 8 N*m (72 in. lbs.)
torque.
SOLENOID
CASE CONNECTOR
Fig. 124 Solenoid Connector Installation—46RH
(8) Verify t h a t solenoid wires are properly routed
(Fig. 125). Solenoid w i r e s must b e clear of rear
b a n d lever, manual lever a n d park rod.
Fig. 125 Solenoid Wire Routing—46RH
Valve Body Final Assembly And Adjustment
(1) Insert manual lever detent spring in upper
housing.

Hide quick links:

Advertisement

loading