Download Print this page

Maintenance And Inspection; Internal Energies; Power Source; Cooling Water - EBARA ESA200W Instruction Manual

Multi-stage dry vacuum pump

Advertisement

P.54

8. Maintenance and Inspection

8.1 Internal energies

Following items show internal energies that shall be considered before start
service maintenance.

8.1.1 Power source

This pump is supplied with AC200V power source. Aside from the pump, the
accessory power source locating in the vicinity of the power connectors are
supplied with voltage even when the pump is completely stopped. To conduct
pump maintenance or service, be sure to turn off the breaker switch, lock it out
and then unplug the power cable. Refer to Section 3.4 in this manual for locking
out the breaker switch.

8.1.2 Cooling water

This pump is supplied with cooling water at pressure of maximum 0.4 MPa.
Disconnection of the cooling water resulted from improper handling may cause
electrification and unit damage.
cooling water connection plugs on the inlet and outlet, and seal off with plastic
cap. The self-sealing plug is used for the cooling water connection plug in these
pumps.

8.1.3 Nitrogen gas

This pump is supplied with nitrogen gas at pressure of maximum 0.7 MPa for
diluting and sealing inside the pump. For service and transportation, close the
supply-source valve to reduce the pressure with the regulator and detach the gas
connection. Close nitrogen port with blank off plug. If the pump has already
operated with process gases, purge the residual gases with nitrogen gas after
stopping the pump operation. Then, conduct maintenance.
PM10U
For service and transportation, unplug the
EBARA
CORPORATION

Advertisement

loading