Refer to
Cable Connections
connect the leads before starting compensation.
The Test Lead Compensation routine also performs
resistance and capacitance compensation. The page
displays the Pass/Fail status of the last compensation
done.
Note: Always perform a test lead compensation if the
test leads have recently been removed or
replaced.
Date and Time identifies when the last
compensation was done or application
installation time.
Start Compensation button allows you to start
the Test Lead Compensation by overwriting
the current test lead characteristics.
To perform a test lead compensation:
1. Connect the cables to the unit, leave all test
leads open, and press
compensation.
2. Follow the on-screen dialogue boxes for next
steps.
© 2020 Radiodetection Ltd
on page 8 on how to
to start
6100-Cu Multifunction Copper Tester Operation Manual

7.9 FED Control

FED Control is an option-enabled feature that tells the
test set to detect and control the Teletech TS125 or
Viavi UltraFED™ IIB remote FED (far end device)
during testing. Pair Detective, Auto Test and many
manual tests will automatically detect and control the
FED when this option is enabled, saving you multiple
trips to the far end after it is initially placed on the line.
The FED should always be connected to ground as
well as the P.U.T. (pair under test).
By connecting the T-R-G/A-B-E of a customer's pair
(CPE) to the customer side of the FED (blue labeled
connectors; the red labeled connectors are connected to
CO/Exchange side of the pair for pass-through mode),
control signals are sent to the FED by the 6100-Cu in
order
to
open/short
CO/Exchange) the T-R-G/A-B-E connections.
Connect T-R-G/A-B-E as follows for each FED state:
1. For Pass Through/Exchange Connect,
connect the T-R/A-B wires to the blue-labeled
Pair1-Cu connectors on the FED (customer
side), and the network side T-R/A-B to the red-
labeled Pair1 Ex-CO connectors towards the
CO/Exchange.
2. For Open, connect the T-R/A-B and ground
wires to the customer side of the FED (blue
labeled connectors).
(or
pass
through
to
the