Avaya S8700 Maintenance Manual page 88

For multi-connect configurations
Hide thumbs Also See for S8700:
Table of Contents

Advertisement

Alarms, Errors, and Troubleshooting
Have you completed the steps in the
Enter \f(HBstatus spe\fH. Is the standby SPE
Enter \f(HBtest spe-standby long\fH and wait
Do all tests except for STBY-SPE test 855 pass?
Busyout the standby SPE and enter \f(HBtest dup long\fH.
Do all DUPINT and DUP-CHL tests pass?
When call service needs allow for a
possible disruption, release the standby
SPE and wait for it to refresh (\f(HBstatus spe\fH).
Enter \f(HBreset system interchange\fH. Did the
Busyout the standby SPE and enter \f(HBtest dupint long\fH.
Run the long test sequence on the active SW-CTL.
Enter \f(HBtest stored data long\fH.
Figure 4-3. Testing the Standby SPE
4-14
Issue 1 May 2002
preceding flowchart?
yes
fully refreshed with handshake up?
yes
for all tests to execute.
yes
yes
planned interchange succeed?
yes
Do all tests pass?
yes
Do all tests pass?
yes
Do all tests pass?
yes
Follow normal esclation procedures.
no
Troubleshoot using MO documentation
for STBY-SPE.
no
Consult MO documentation for the
component whose test failed.
no
Consult MO documentation for
DUPINT or DUP-CHL.
no
Consult the following discussion of
planned interchange failure.
no
Consult MO documentation for DUPINT.
no
Consult MO documentation for SW-CTL.
no
Consult MO documentation for the
component whose test failed.
555-233-143