Avaya S8700 Maintenance Manual page 883

For multi-connect configurations
Hide thumbs Also See for S8700:
Table of Contents

Advertisement

ASAI-PT
Level 1 Status Inquiry Test (#621)
This test determines the state of the transmission facility of a BRI port at the
Level 1 (L1) or physical layer. L1 can be in one of two possible states: Activated
or Deactivated.
The Activated state is the correct state for an ISDN-BRI port. In this state the
Level 1 interface can communicate with the BRI endpoint or ASAI adjunct
administered on this port. This test passes if the state of L1 is activated. This test
also passes if software has taken this port out of service.
The Deactivated state indicates a problem with the ASAI circuit pack. When in
this state, the Level 1 interface is idle and is not trying to communicate with the
BRI endpoints or adjunct. When an ASAI port is placed in the out-of-service state,
Level 1 is also put into the deactivated state. This could be due either to the
system detecting a fault with the port or in response to a busyout port UUCSSpp
request.
Table 8-62. Test #621 Level 1 Status Inquiry
Error
Test
Code
Result
Description / Recommendation
1187
ABORT
The board, port, or station may have been busied-out by a technician.
1. Look in the Error Log for Error Type 18 (port busied out) for this port and
2. Make sure the terminal is connected.
3. Retry the command at 1-minute intervals up to 5 times.
2000
ABORT
Response was not received from the circuit pack within the allowable time
period.
1. If the test aborts repeatedly up to 5 times, reset the circuit pack using the
2. If the test aborts again, replace the circuit pack.
2012
ABORT
Internal system error
2100
ABORT
Could not allocate the necessary system resources to run this test.
1. Retry the command at 1-minute intervals up to 5 times.
555-233-143
ASAI-BD (board busied out). If this error type is present for ASAI-PT only,
then release the port using the release port pp command and run the test
again. If the error is present for both ASAI-BD and ASAI-PT, then release
the board with the release port UUCSS command and run the test again.
NOTE:
When you release a port, you release every port associated with it. If
certain ports still need to be busied out, use the busyout port
UUCSSpp command to busy them out.
busyout board UUCSS and reset board UUCSS commands.
Continued on next page
Issue 1 May 2002
8-161

Advertisement

Table of Contents
loading

Table of Contents