Maintenance Commands

test board

test board UUCSS [short | long] [repeat# | clear] [schedule]
The test board command will validate that the board exists at the specified
location. Based on the logical type (for example, Analog, Digital, Hybrid) of board
a series of tests will be executed. Each individual test will exercise diagnostics on
the board and then return results of the test along with any possible error codes.
Destructive long tests on a Switch Node Interface (SNI) board are not allowed
unless the board has been busied out.
For more information, see the following sections:
on page 7-6
The following display shows a typical result when test board 1D07 is entered and
slot 1D07 hods a Digital Line circuit pack with 7 ports administered.
test board 1d07 short
Port
Maintenance Name
01D07
DIG-BD
01D0701
DIG-LINE
01D0701
DIG-LINE
01D0702
PDMODULE
01D0703
PDMODULE
01D0704
PDMODULE
01D0705
DIG-LINE
01D0705
DIG-LINE
01D0706
DIG-LINE
01D0706
DIG-LINE
01D0707
DIG-LINE
01D0707
DIG-LINE
Command successfully completed
7-420
Issue 1 May 2002
and
''Common Output Fields'' on page
TEST RESULTS
Alt.
Name Test No.
52
5401
16
5401
17
5460
17
5461
17
5444
17
16
17
Attd2
16
Attd2
17
Attd1
16
Attd1
17
''Common Input Parameters''
7-9.
Result
Error Code
PASS
PASS
PASS
PASS
ABORT
5
ABORT
5
ABORT
1392
ABORT
1392
PASS
PASS
PASS
PASS
555-233-143

Advertisement

Table of Contents
loading

Table of Contents